The engineer opted to conduct Perth Sand Penetrometer (PSP) tests to assess the level of compaction underneath the limestone footings. Results suggested an inadequate level of compaction below the existing footings
To prevent further cracking and taking into consideration the additional loads for the proposed second storey, Foundation Engineering recommended and designed a certified Microfine Cement Grout formation to accommodate the increased loads requirements.
Share on Twitter Share on Facebook